当前查询到6条专利与查询词 "【中文】国网四川省电力公司德阳供电公司【EN】DEYANG POWER SUPPLY COMPANY, STATE GRID SICHUAN ELECTRIC POWER Corp."相关,搜索用时0.4531301秒!排序方式:
发明专利:4实用新型: 2外观设计: 0
4 条,当前第 1-4 条 返回搜索页
申请号:201911214038.8 公开号:CN110957669A 主分类号:H02G1/02
摘要:【中文】本发明涉及电力线路维护检测领域,具体涉及一种辅助悬挂软梯的悬挂装置,包括用于连接无人机的牵引件,所述牵引件上设置有牵引绳,所述牵引绳可拆卸连接有梯头,所述梯头底部连接有软梯,所述梯头上设置有滑轮机构和用于限制所述滑轮机构转动的刹车机构,减少了工作人员登高悬挂梯头的作业流程,减少悬挂工作量,提高悬挂安全性,同时,可根据实际情况,沿悬挂位置移动梯头,方便梯头移动至合适的工作位置,同时,可通过设置在梯头上的刹车机构限制滑轮机构的转动,将梯头限制在悬挂位置,避免梯头受悬挂位置的倾斜状态或重力作用的影响而移动,保证悬挂装置的稳定安全使用。 【EN】The invention relates to the field of power line maintenance and detection, in particular to a suspension device for an auxiliary suspension rope ladder, which comprises a traction piece for connecting an unmanned aerial vehicle, the traction piece is provided with a traction rope, the traction rope is detachably connected with a ladder head, the bottom of the ladder head is connected with a flexible ladder, the pulley mechanism and the brake mechanism for limiting the rotation of the pulley mechanism are arranged on the ladder head, so that the working flow of hanging the ladder head when a worker ascends is reduced, the hanging workload is reduced, the hanging safety is improved, meanwhile, the ladder head can be moved along the hanging position according to the actual situation, so that the ladder head can be conveniently moved to a proper working position, meanwhile, the rotation of the pulley mechanism can be limited by the brake mechanism arranged on the ladder head, the ladder head is limited at the hanging position, the ladder head is prevented from moving under the influence of the inclined state or the gravity action of the hanging position, and the stable and safe use of the hanging device is ensured.
详细信息 下载全文

申请号:201911214039.2 公开号:CN110994448A 主分类号:H02G1/02
摘要:【中文】本发明涉及电力线路维护检修领域,具体涉及一种便携式托瓶架悬挂装置,所述悬挂装置包括卡具和悬挂体,所述卡具设置在塔身上,所述卡具上设置有与所述悬挂体适配的卡槽,所述悬挂体上设置有与托瓶架可拆卸连接的调节组件,所述调节组件上设置有水平检测机构,使得只需要将悬挂体与托瓶架连接后,提升至塔身上,将悬挂体采用悬挂的方式安装到塔身上,即可实现托瓶架在塔身上的安装,安装方便快捷,不需要捆绑绳索,省时省力,同时,通过设置水平检测机构,使得作业人员可较容易的根据水平检测机构将托瓶架悬挂水平,使托瓶架为绝缘子串提供平稳的支撑力,保证绝缘子串的安全安装和拆卸。 【EN】The invention relates to the field of power line maintenance and repair, in particular to a portable bottle supporting frame hanging device which comprises a clamp and a hanging body, wherein the clamp is arranged on a tower body, the clamp is provided with a clamping groove matched with the hanging body, the hanging body is provided with an adjusting component detachably connected with the bottle supporting frame, the adjusting component is provided with a level detection mechanism, so that the bottle supporting frame can be installed on the tower body only by connecting the hanging body with the bottle supporting frame and then lifting the hanging body to the tower body, and the hanging body is installed on the tower body in a hanging manner, thereby realizing the installation of the bottle supporting frame on the tower body, being convenient and rapid to install, needing no rope binding, saving time and labor, meanwhile, through the level detection mechanism, an operator can easily hang the bottle supporting frame horizontally according to the level detection mechanism, and providing stable supporting force for an insulator string by the bottle supporting frame, and the safe installation and disassembly of the insulator string are ensured.
详细信息 下载全文

申请号:201911215067.6 公开号:CN110979993A 主分类号:B65D79/00
摘要:【中文】本发明涉及电力领域用辅助设备,具体涉及一种电力系统辅助操作工具出入库用收纳箱,包括箱体,所述箱体内设置有若干容纳腔,所述箱体上设置有用于录入借还信息的操作显示屏,还包括清理机构和监测机构,所述清理机构用于清除放置在所述容纳腔内的操作工具上的异物,所述监测机构用于确定所述容纳腔的盛放状态,实现对操作工具借还情况的跟踪,减少纸件录入过程,实现操作工具借还情况的无纸化跟踪记录,避免操作工具丢失,同时,在操作工具归还后自动进行维护保养,减少作业人员的工作量,避免影响操作工具的循环使用,延长操作工具的使用寿命,减少借还操作工具的时间,保证输电运检过程的顺利进行。 【EN】The invention relates to auxiliary equipment used in the field of electric power, in particular to a storage box for an auxiliary operating tool in and out of a power system, which comprises a box body, wherein a plurality of accommodating cavities are arranged in the box body, an operating display screen for inputting borrowing and returning information is arranged on the box body, the storage box also comprises a cleaning mechanism and a monitoring mechanism, the cleaning mechanism is used for cleaning foreign matters on the operating tool placed in the accommodating cavities, the monitoring mechanism is used for determining the accommodating state of the accommodating cavities, realizing the tracking of the borrowing and returning conditions of the operating tool, reducing the paper input process, realizing paperless tracking and recording of the borrowing and returning conditions of the operating tool, avoiding the loss of the operating tool, and meanwhile, automatically maintaining after the returning of the operating tool, reducing the workload of operators, avoiding influencing the recycling of the operating tool, prolonging the service life of the operating tool and reducing the time for borrowing and returning the operating tool, the smooth operation of the power transmission operation and detection process is ensured.
详细信息 下载全文

申请号:201911215103.9 公开号:CN110992623A 主分类号:G08B13/191
摘要:【中文】本发明涉及电力线路安全的监控领域,具体涉及一种高压线下环境监控警示装置,包括与高压线铁塔一一对应设置的监视机构,所述监视机构包括圆筒状的护筒,所述护筒包括设置在地面以下的安装段和位于地面以上的监测段,所述监测段上设置有监测口,所述监测口对应的所述护筒内设置有用于安装监测仪器的平台,所述监测仪器连接有警示报警装置,通过设置监视机构监视高压线铁塔附近环境,采用护筒对监测仪器进行防护,延长监测仪器的使用寿命,避免监测仪器受到外界环境影响,同时,圆筒状的护筒结构简单,能够较容易的通过开挖土壤再填埋的方式进行设置,减少环境监控警示装置的设置成本。 【EN】The invention relates to the field of monitoring of power line safety, in particular to a monitoring and warning device for the environment under a high-voltage line, which comprises monitoring mechanisms which are arranged in one-to-one correspondence with iron towers of the high-voltage line, the monitoring mechanism comprises a cylindrical protective cylinder, the protective cylinder comprises an installation section arranged below the ground and a monitoring section positioned above the ground, the monitoring section is provided with a monitoring port, a platform for installing a monitoring instrument is arranged in the protective cylinder corresponding to the monitoring port, the monitoring instrument is connected with a warning device, the monitoring mechanism is arranged to monitor the environment near the high-voltage line iron tower, the protective cylinder is adopted to protect the monitoring instrument, the service life of the monitoring instrument is prolonged, the monitoring instrument is prevented from being influenced by the external environment, simultaneously, cylindric pile casing simple structure, the mode that can be easier bury again through excavation soil sets up, reduces environment monitoring warning device's the cost that sets up.
详细信息 下载全文

4 条,当前第 1-4 条 返回搜索页