Patent9 专利在线
高级搜索 ▼
申请号或专利号
公开号
专利名称
专利摘要
申请人
发明人
全部专利
发明专利
实用新型专利
外观设计专利
高级搜索 - 多字段组合检索
+ 增加条件
查询语句:
(请输入搜索条件)
普通搜索
当前查询到
1
条专利与查询词 "
【中文】宁夏昌禾装饰工程有限公司【EN】Ningxia Changhe Decoration Engineering Co., Ltd
"相关,搜索用时0.3593808秒!
排序方式:
按相关度排序
按申请日升序↑
按申请日降序↓
按公开日升序↑
按公开日降序↓
发明专利:
1
实用新型:
0
外观设计:
0
共
1
条,当前第
1-1
条
返回搜索页
1:
[发明]
【中文】一种新型水管道铺设方法 【EN】Novel water pipeline laying method
申请号:
201911166283.6
公开号:CN111075991A 主分类号:F16L1/00
申请人:
【中文】宁夏昌禾装饰工程有限公司【EN】Ningxia Changhe Decoration Engineering Co., Ltd
申请日:2019.11.25 公开日:2020.04.28
发明人:
【中文】闫生春
;
谭宝军
;
闫生昌
;
马海波【EN】Yan Shengchun
;
Tan Baojun
;
Yan Shengchang
;
Ma Haibo
摘要:【中文】本发明一种新型水管道铺设方法,将传统铺设在地下的水管道改为铺设在天花板上,通过对管道铺设定位,管道铺设开槽、打眼,管道铺设,管道铺设连接,管道通水压力测试和管道通水测试,使用抱箍吊卡对管道进行固定,并在热水管道外包缠保温棉,以阻止热水管道的散热,管道安装好并正常工作;本发明改变了传统的方法,水管道走顶时水电工仅仅需要使用冲击钻在房屋顶面按照固定间距打眼即可,节省电费、人力成本下降、工费成本下降,发生漏水时通过水滴到天花板上的声音可以很容易的感知到漏水情况的发生,且渗漏点肉眼观察即可准确定位,维修简便,肉眼观察渗漏点后将渗漏点进行处理即可。 【EN】The invention relates to a novel water pipeline laying method, which is characterized in that a water pipeline which is traditionally laid on the ground is changed into a water pipeline which is laid on a ceiling, and the pipeline is laid and positioned, and is grooved and perforated, laid and connected, and subjected to water pressure test and water test, the pipeline is fixed by using a hoop elevator, and heat insulation cotton is wrapped outside a hot water pipeline to prevent the heat dissipation of the hot water pipeline, so that the pipeline is well installed and normally works; the invention changes the traditional method, when the water pipeline goes to the top, water and electricity workers only need to use the impact drill to drill holes on the top surface of the house according to a fixed distance, so that the electricity cost, the labor cost and the labor cost are saved, when water leakage occurs, the water leakage condition can be easily sensed through the sound of water dropping on the ceiling, the leakage point can be accurately positioned by visual observation, the maintenance is simple and convenient, and the leakage point can be treated after the visual observation.
详细信息
下载全文
共
1
条,当前第
1-1
条
返回搜索页