当前查询到2条专利与查询词 "【中文】湖南玛瑙山矿业有限公司【EN】Hunan Manaoshan Mining Co., Ltd."相关,搜索用时0.2656276秒!排序方式:
发明专利:2实用新型: 0外观设计: 0
2 条,当前第 1-2 条 返回搜索页
申请号:201911065827.X 公开号:CN110898980A 主分类号:B03B5/06
摘要:【中文】本发明公开了一种矿浆沉降分级设备,包括分级箱机构和摇床机构,分级箱机构的下方固定设置摇床机构,通过在分级箱的下端安装倾斜角度调节装置,使得分级箱倾斜,通过调节倾斜角度达到调节矿浆流动速度,继而决定分级时间,使得对矿浆的分级效果更好;通过将矿浆出口设置为喇叭状结构,且在矿浆出口的非正中线上安装矿浆出口进水管,通过水流冲击,使得矿浆出口内的矿浆形成漩涡,使得内部矿浆中的细成分往上,粗成分往下,进一步增加分级效果,节能环保高效。 【EN】The invention discloses an ore pulp sedimentation grading device, which comprises a grading box mechanism and a shaking table mechanism, wherein the shaking table mechanism is fixedly arranged below the grading box mechanism, an inclination angle adjusting device is arranged at the lower end of the grading box, so that the grading box is inclined, the flowing speed of ore pulp is adjusted by adjusting the inclination angle, and then the grading time is determined, so that the grading effect on the ore pulp is better; through setting up the ore pulp export into loudspeaker column structure, and install ore pulp export inlet tube on the non-median line of ore pulp export, through water impact for the downthehole ore pulp of ore pulp export forms the swirl, makes the thin composition in the inside ore pulp up, and the coarse component down further increases grading effect, and is energy-concerving and environment-protective high-efficient.
详细信息 下载全文

申请号:201911066333.3 公开号:CN111215315A 主分类号:B07B1/22
摘要:【中文】本发明公开了一种原矿石输送筛分设备,包括输送装置和筛分装置,筛分装置安装在输送装置的侧端,传送履带和筛分筒均倾斜安装,接触端向上突起,且传送履带的抛料点高于筛分筒的接料点,使矿石在重力作用下形成一定初速度进入筛分筒,减小筛分筒使矿石行进所需消耗的能量,减小生产成本;筛分筒可以进行续接,自由调节筛分筒的长度,保证矿石在筛分筒内有充足的筛分时间,提高筛分精度,且筛分筒通过连接杆B与支撑柱A活动连接,自由调整筛分筒的倾斜坡度,有效控制矿石在筛分筒的滚动速度,达到较好的分离效果;该原矿石输送筛分设备,结构优异,使用方便,能耗低。 【EN】The invention discloses raw ore conveying and screening equipment which comprises a conveying device and a screening device, wherein the screening device is arranged at the side end of the conveying device, a conveying crawler and a screening cylinder are obliquely arranged, the contact end protrudes upwards, and the throwing point of the conveying crawler is higher than the receiving point of the screening cylinder, so that ores form a certain initial speed under the action of gravity and enter the screening cylinder, the energy consumed by the movement of the ores by the screening cylinder is reduced, and the production cost is reduced; the screening cylinder can be continuously connected, the length of the screening cylinder is freely adjusted, sufficient screening time of ores in the screening cylinder is guaranteed, screening precision is improved, the screening cylinder is movably connected with the support column A through the connecting rod B, the inclination of the screening cylinder is freely adjusted, the rolling speed of the ores in the screening cylinder is effectively controlled, and a good separation effect is achieved; the raw ore conveying and screening equipment is excellent in structure, convenient to use and low in energy consumption.
详细信息 下载全文

2 条,当前第 1-2 条 返回搜索页