当前查询到7条专利与查询词 "陈锐【EN】Tian Yong"相关,搜索用时0.9374601秒!排序方式:
发明专利:2实用新型: 5外观设计: 0
2 条,当前第 1-2 条 返回搜索页
申请号:201911420456.2 公开号:CN111119470A 主分类号:E04G11/38
摘要:【中文】本发明公开了一种全自动液压行走拖模,它包括导轨、液压推力装置、牵引杆、模板背桁架、滑升模板、抹面平台,所述导轨为两条梯形导轨,所述模板背桁架设置在两条导轨上,所述模板背桁架的底部设置有滑升模板,所述滑升模板位于导轨的顶侧,所述模板背桁架的两端通过螺栓安装有牵引杆,所述牵引杆的另一端垂直设置有牵引杆托臂,所述液压推力装置包括液压伸缩杆、撑钩件、转档件,所述液压伸缩杆的一端设置有撑钩件,另一端通过销轴安装在牵引杆托臂上,所述转档件的一端通过销轴安装在牵引杆托臂上,所述转档件的另一端与导轨的横梁接触,所述抹面平台通过销轴安装在模板背桁架的一侧。本发明施工材料消耗小、安全性高、同步性好。 【EN】The invention discloses a full-automatic hydraulic walking drag mold, which comprises a guide rail, a hydraulic thrust device, a traction rod, a template back truss, a sliding template and a plastering platform, the guide rails are two trapezoidal guide rails, the template back truss is arranged on the two guide rails, the bottom of the template back truss is provided with a sliding template, the sliding template is positioned at the top side of the guide rail, the two ends of the template back truss are provided with traction rods through bolts, the other end of the draw bar is vertically provided with a draw bar supporting arm, the hydraulic thrust device comprises a hydraulic telescopic rod, a supporting hook piece and a gear shifting piece, one end of the hydraulic telescopic rod is provided with a bracing piece, the other end is arranged on a support arm of the traction rod through a pin shaft, one end of the rotating baffle piece is arranged on the support arm of the traction rod through a pin shaft, the other end of the rotating baffle piece is in contact with the cross beam of the guide rail, and the plastering platform is arranged on one side of the template back truss through a pin shaft. The invention has the advantages of low consumption of construction materials, high safety and good synchronism.
详细信息 下载全文

申请号:201911205776.6 公开号:CN110847619A 主分类号:E04G21/24
摘要:【中文】本发明公开了一种高层建筑的砼养护装置及方法,该装置包括蒸汽输送管和脚手架,所述脚手架设置于楼层主体施工区域的外侧,所述脚手架的顶部可拆装地连接有钢屋架,所述脚手架与所述钢屋架共同构成主体架,所述主体架的外侧罩设有篷布单,所述蒸汽输送管的上部设置有与所述楼层主体施工区域相对应的多个出气孔,所述蒸汽输送管的下部连接蒸养机。本发明的有益效果:可对高层、超高层建筑结构进行砼的冬季施工养护,方法简便,节约场地、施工环保,节约施工成本。 【EN】The invention discloses a concrete curing device and method for a high-rise building, the device comprises a steam conveying pipe and a scaffold, the scaffold is arranged on the outer side of a floor main body construction area, the top of the scaffold is detachably connected with a steel roof truss, the scaffold and the steel roof truss jointly form a main body frame, a tarpaulin sheet covers the outer side of the main body frame, the upper part of the steam conveying pipe is provided with a plurality of air outlet holes corresponding to the floor main body construction area, and the lower part of the steam conveying pipe is connected with a steam curing machine. The invention has the beneficial effects that: the method can be used for carrying out winter construction and maintenance on the concrete of high-rise and super high-rise building structures, is simple and convenient, saves the field, is environment-friendly in construction, and saves the construction cost.
详细信息 下载全文

2 条,当前第 1-2 条 返回搜索页