当前查询到7条专利与查询词 "Guo Weikai"相关,搜索用时0.3593624秒!排序方式:
发明专利:2实用新型: 2外观设计: 3
2 条,当前第 1-2 条 返回搜索页
申请号:201911295041.7 公开号:CN111160149A 主分类号:G06K9/00
摘要:【中文】本发明公开了基于运动场景及深度学习的车载人脸识别实时监控系统及方法,包括:设置于警用车车顶板的摄像装置、服务器和终端;所述摄像装置实时采集数据,对采集的视频进行处理后传输至服务器;所述服务器包括人脸识别模块和系统人脸数据库,人脸识别模块为训练好的模型,采用深度学习方法进行人脸特征提取,进而比对摄像装置视频中的人脸和系统人脸数据库中的人脸,若一致,则将信息发送至终端。通过与服务器所述的身份数据库进行人脸比对,发现可疑人员后通过网络对终端发出提醒和报警,第一时间锁定嫌犯,采取控制措施,避免不必要的伤亡,提升安全性。 【EN】The invention discloses a vehicle-mounted face recognition real-time monitoring system and method based on a motion scene and deep learning, which comprises the following steps: the system comprises a camera device, a server and a terminal, wherein the camera device, the server and the terminal are arranged on a top plate of a police car; the camera device collects data in real time, processes the collected video and transmits the processed video to the server; the server comprises a face recognition module and a system face database, wherein the face recognition module is a trained model, a deep learning method is adopted for extracting face features, the face in the video of the camera device is compared with the face in the system face database, and if the face features are consistent with the face in the system face database, information is sent to the terminal. Through with the server identity database carry out the people's face and compare, send the warning and report to the police to the terminal through the network after discovering suspicious personnel, the very first time locks the suspects, takes control measures, avoids unnecessary casualties, promotes the security.
详细信息 下载全文

申请号:201911044951.8 公开号:CN110994417A 主分类号:H02B3/00
摘要:【中文】本发明公开了一种车载式移动施工电源的现场安装方法,包括施工准备、接地网施工、垫层施工、设备安装、设备调试、进出线电缆续接和质量验评。本发明的有益效果是:在整体吊装前吊装人员明确设备的大致重量,重心位置,消除存在着的安全隐患,施工准备时在现场设置移动回收箱,并将废弃物分类收集、保管,进行无害化处理,能达到优化设备利用率、降低成本、提高工作效率的目的,并实现环保目的,进行设备安装时,应对设备基础设木质保护条进行保护,避免施工时损坏基础边角。 【EN】The invention discloses a field installation method of a vehicle-mounted mobile construction power supply, which comprises construction preparation, grounding grid construction, cushion layer construction, equipment installation, equipment debugging, incoming and outgoing cable splicing and quality inspection. The invention has the beneficial effects that: before integral hoisting, the general weight of equipment is made clear to hoisting personnel, the potential safety hazard of existence is eliminated to the focus position, sets up the removal collection box on the scene during construction preparation to with discarded object classification collection, keep, carry out innocent treatment, can reach the purpose of optimizing equipment utilization ratio, reduce cost, improvement work efficiency, and realize the environmental protection purpose, when carrying out equipment fixing, should establish wooden protection strip to the equipment foundation and protect, damage the basis corner when avoiding the construction.
详细信息 下载全文

2 条,当前第 1-2 条 返回搜索页