当前查询到3条专利与查询词 "Tao Changzhou"相关,搜索用时0.1718547秒!排序方式:
发明专利:3实用新型: 0外观设计: 0
3 条,当前第 1-3 条 返回搜索页
申请号:201911396418.8 公开号:CN111122433A 主分类号:G01N19/04
摘要:【中文】本发明公开了一种卷材烘烤测试装置,涉及卷材测试仪器技术领域,包括:底架,包括平行设置的两个直线托架,所述两个直线托架的一端设置有卷材轴安装架,另一端设置有横梁,所述两个直线托架中部设置有垂直于所述直线托架的横向滑动机构安装架;纵向滑动机构,设置于所述底架上;托盘,设置于所述纵向滑动机构上,在所述纵向滑动机构的带动下沿所述两个直线托架滑动;喷火枪组件,所述喷火枪组件设于所述横向滑动机构安装架上,能够在所述托盘上方横向移动;卷材轴组件,可拆卸的转动安装于所述卷材轴安装架;该测试装置可以提高卷材烘烤测试的客观性和准确性。 【EN】The invention discloses a coiled material baking test device, which relates to the technical field of coiled material test instruments and comprises the following components: the coil winding device comprises a chassis, a winding mechanism and a winding mechanism, wherein the chassis comprises two linear brackets which are arranged in parallel, a coil shaft mounting rack is arranged at one end of each of the two linear brackets, a cross beam is arranged at the other end of each of the two linear brackets, and a transverse sliding mechanism mounting rack perpendicular to the linear brackets is arranged in the middle of each of the two linear brackets; the longitudinal sliding mechanism is arranged on the underframe; the tray is arranged on the longitudinal sliding mechanism and driven by the longitudinal sliding mechanism to slide along the two linear brackets; the flame gun assembly is arranged on the transverse sliding mechanism mounting frame and can transversely move above the tray; the coiled material shaft assembly is detachably and rotatably arranged on the coiled material shaft mounting frame; the testing device can improve the objectivity and the accuracy of the coiled material baking test.
详细信息 下载全文

申请号:202010008382.8 公开号:CN110939422A 主分类号:E21B43/26
摘要:【中文】本发明提供一种具有射孔子簇的水平井分段多簇限流压裂方法,具体步骤为:步骤一,确定压裂段内射孔簇数及各射孔簇的位置;步骤二,每个射孔簇位置设置多个射孔子簇,射孔子簇的间距不小于2 m且不超过8 m;步骤三,下入射孔工具在水平井段内既定位置射孔,形成具有射孔子簇的射孔簇;步骤四,进行压裂施工,射孔簇的多个子簇均会起裂并倾向于沿井筒两侧的不同方向延伸,在段内射孔簇位置形成井筒两侧近乎均匀对称的水力裂缝。本发明,利用射孔孔眼的限流效应,裂缝自射孔子簇起裂并分别向水平井筒两侧扩展,从而在每个射孔簇位置形成在井筒两侧近乎均匀对称的水力裂缝。从而能够达到减少无效射孔簇的产生、提高储层改造程度的目的。 【EN】The invention provides a horizontal well subsection multi-cluster current-limiting fracturing method with perforating sub-clusters, which comprises the following specific steps: determining the number of perforation clusters and the positions of the perforation clusters in a fracturing section; step two, arranging a plurality of perforating sub-clusters at each perforating cluster position, wherein the spacing between the perforating sub-clusters is not less than 2m and not more than 8 m; thirdly, putting a perforating tool into the horizontal well section for perforating at a set position to form a perforating cluster with perforating sub-clusters; and fourthly, carrying out fracturing construction, wherein a plurality of sub-clusters of the perforation cluster can be cracked and tend to extend along different directions of two sides of the shaft, and hydraulic fractures which are approximately uniform and symmetrical on two sides of the shaft are formed at the positions of the perforation clusters in the section. According to the invention, by utilizing the current-limiting effect of the perforation holes, the cracks are initiated from the perforation sub-clusters and are respectively expanded to two sides of the horizontal shaft, so that the hydraulic cracks which are approximately uniform and symmetrical on two sides of the shaft are formed at the position of each perforation cluster. Therefore, the aims of reducing the generation of ineffective perforation clusters and improving the reservoir transformation degree can be achieved.
详细信息 下载全文

申请号:202010179887.0 公开号:CN111236910A 主分类号:E21B43/26
摘要:【中文】本发明提供一种大井组平台丛式井高效压裂方法,具体步骤为:大井组平台采用1套压裂设备、2套泵注系统、2套测井设备,以3‑6口井为1个作业单元,采用多通道高压分配器一次性连接至所有井口,通过井间切换实现多口井同步交叉作业;大井组平台丛式井组井筒内措施不间断压裂施工。本发明配套高低压分配器、多通道高压分配器、4寸高压管线、8寸大管径供液管线,减少井场高低压管线数量,标准化布局。使得在水平井改造段数增多,施工规模增大的情况下,能大大缩短施工改造时间及完井周期,有效地提高了丛式水平井作业施工效率及施工效益。 【EN】The invention provides a high-efficiency fracturing method for a large well group platform cluster well, which comprises the following specific steps: the large well group platform adopts 1 set of fracturing equipment, 2 sets of pumping systems and 2 sets of logging equipment, takes 3-6 wells as 1 operation unit, adopts a multi-channel high-pressure distributor to be connected to all well heads at one time, and realizes synchronous cross operation of the multiple wells through inter-well switching; and (4) performing continuous fracturing construction in the large well group platform cluster well group shaft. The invention is matched with a high-low pressure distributor, a multi-channel high pressure distributor, a 4-inch high pressure pipeline and an 8-inch large-diameter liquid supply pipeline, reduces the number of high-low pressure pipelines of a well site and is in standardized layout. Under the conditions that the number of the horizontal well modification sections is increased and the construction scale is increased, the construction modification time and the well completion period can be greatly shortened, and the operation construction efficiency and the construction benefit of the cluster horizontal well are effectively improved.
详细信息 下载全文

3 条,当前第 1-3 条 返回搜索页